Inspection of a complex project according to specification is accomplished by : A. inspection by attributes. B. cyclical inspection C. quality conformance inspection D. original inspection E.None of the above
C PMBOK 5.4.2.1 inspection 定义: include activities such as measuring,examining,and testing undertaken to determine whether result conform to requirement. 答案 C 符合
-------------------------------------------------------------------------------------------------------- 网名:阿坤 qq 4951954 msn veinstone@hotmail.com mail zxk91@sina.com