1、On a project the PM should strive for a "Quality Level" that: a. is the highest level possible b. is as close to the project objectives as possible c. represents the lease cost to the project d. exceeds the specified requirements of the project e. a and b
2, To ensure the project team provides the functionality the customer expects in a new piece of software, the PM ask the customer for sign-off on the criteria. These documents are: a. technical specifications b. performance specifications c. product descriptions d. quality assurance