At xyz Inc.,the hourly wage for semi-skilled workers is $14.00.the annual audit shows that fringe benefits cost 30%of basic wages and that overhead costs are 60% of wages plus fringe benefits.what is the loaded hourly wage for a semi-skilled worker at xyz Inc.? a.$27.14, b. $28.96 c.$30.03 d. $29.12